Having completed numerous projects for H&M, this installation at 591-593 Broadway in New York, NY, was a typical endeavor for us. Our scope of work included extensive drywall installation, encompassing new partitions, plywood on walls, new ceilings, and patching of existing cellar ceilings. We also installed a platform, framed steps at the Mercer entrance, and performed various patching tasks. The acoustical work involved installing USG tile/grid and Metalworks in a specified grid. Carpentry tasks included the installation of 24 doors, hardware changes, and various fixtures such as lockers, appliances, coat racks, TVs, tables, chairs, and other furniture. We also handled millwork installations, including floor fixtures, cashwraps, backwraps, light boxes, fitting room accessories, and perimeter rail fixtures.